RAW MATERIALS
:
Selected, high quality raw materials which are preferable and
approved for specified requirement are being practiced. In order to
attain a maximum lining quality and properties formulation of these
materials is strictly according to the material manufacturer’s
recommendation. All materials selected and applied are especially
designed to perform ideal for the local conditions and to prevail a
perfect laminate. Apart from the above, if the Lining is for potable
water intended for human consumption ultimate care is ensured for
raw material practices.
PROCESS :
Onsitu lining is carried out in five
essential steps.
1. Raw Material
Storage
2. Surface Preparation
3. Surface Priming
4. Application of laminate
5. Top Coating
6. Final Inspection
1. Raw
Material Storage :
Since the materials used for the purpose comes under hazardous grade
it is ensured that the storage should comply with the requirement /
facility advised in COSHH statement.
2. Surface
Preparation :
Surfaces to
which the lining shall be applied should be clean, dry and shall be
free from Crack, deterioration, grease, dust, sharp edges, oil,
loose or any foreign materials.
If the
surface is concrete, it shall be completely cured prior to
application. Major imperfections on the surface shall be leveled
with cement screed. Minor imperfections and holes on the surface
will be cleared with resin putty. All pipe connections to and from
the wall shall be fixed firmly.
3. Surface
Priming :
The clean and
dried surface will be
primed with a
rich coat of Isopthalic resin. Area of priming will be limited to
ensure the lay up to follow on the wet primed surface.
4.
Application of Laminate :
The laminate
will be applied by well trained professionals. The laminate will be
applied layer wise with proper rolling to ensure air free laminate.
Based on the required thickness the no. of layers will be pre
designated and applied accordingly. All layer joints will be
overlapped for a distance not less than 50mm.
5. Top
Coating :
After
ensuring that applied laminate is completely dry the pre designated
coating / C Veil mat lay up followed by coating will be applied.
6. Final
Inspection :
After
ensuring that the lining is completely cured final inspection will
be carried out as per the plan. On successful inspection it will be
handed over to the customer.
QUALITY
ASSURANCE :
Quality
assurance is strictly as per the requirement of BS EN ISO 9001:
2000. All records pertaining to the Quality of the will be preserved
and is available for verification / review whenever required by the
responsible authority.
SAFETY :
All safety measures as mentioned in the COSHH statement, Safety
Statement and all measures insisted by the site management. |